The designer should specify the hold down system to be used for each job.
Typical wall to floor connections are illustrated below in Figures 7.30 - 7.32.
Figure 7.30 Hold down connection Option 1
Figure 7.31 Hold down connection Option 2
Figure 7.32 Hold down connection Option 3
Figure 7.33 Hold down connection Option 4
Figure 7.34a - Transfer of Racking Loads to Internal Bracing Walls - Internal Wall Parallel to Trusses
Figure 7.34b - Transfer of Racking Loads to Internal Bracing Walls - Internal Wall Perpendicular to Trusses
Figure 7.35
Internal to external fixing connections (Option 1)
Figure 7.36
Internal to external fixing connections (Option 2)
General
Content
Integrations